
You are not Broken. You are wired differently.
Take what helps, skip what doesn’t, and remember you don’t have to do this alone.
Save it to your computer. Print it. Write on it. It’s yours.
The Doorway Cost Tracker
Paired worksheet: Autistic Inertia (Why You Can’t Start and Can’t Stop)
Autistic inertia is not a problem with doing. It is a resistance to changing state. A body at rest wants to stay at rest. A body in motion wants to stay in motion. The cost lives in the transition, not the task, and it shows up at both ends: the doorway in, and the doorway out. If you are also ADHD, both systems come due at the same doorway. This worksheet takes one real start you cannot make and one real stop you cannot make, and lowers what each doorway costs instead of asking you to pay the old price with willpower.
1. Name both doorways
One task I want to do and cannot get myself into (the doorway in):
One task or state I keep getting stuck inside and cannot leave (the doorway out):
The story I have been telling about these two (lazy, obsessive, inconsistent, all-or-nothing):
Both of those are the same nervous system, stuck at the same place. You are not two people. You are one mechanism at two doorways.
2. Where the cost actually sits
For the task you cannot start, check every line that is true.
- I want to do it
- I know how to do it
- Once I am in it, it is fine, or even good
- The block is at the moment of beginning, not in the activity
Three or four checks means you are looking at a transition cost, not avoidance. Aim at the doorway.
If you are also ADHD: which part will not fire, the wanting-to-doing signal, the leaving-the-current-state, or both?
3. Shrink the doorway in
Do not start the task. Start the smallest possible version of the transition.
The task, as I have been saying it (for example, “write the report”):
The doorway version, one physical action that takes under two minutes (for example, “open the document and type one ugly sentence”):
Another nervous system I can start next to, in a room or on a call, so I am not generating the state change alone:
Who: _____________________ When: _____________________
4. Prop the doorway out
When you have to stop, stop in a way that makes the next start cheaper, and give yourself runway so you are not yanked out.
- Runway. I will set a signal 10 to 15 minutes before the hard stop, not at it. My signal:
- Messy stop. I will leave the file open, the sentence half-finished, or a sticky note with the literal next physical action. What I will leave:
- The seam. A natural place in this task where leaving costs less (end of a section, after the save, before the next decision):
5. Switch less
A day built on rapid switching is a day built to defeat you. Count the doorways, then remove some.
Transitions I paid for yesterday (list them, including the interruptions):
Two I can batch together, or one long single-state block I can protect this week:
Three things to try this week
- Pay the cheapest doorway. Do the two-minute version from section 3, next to someone if you can. Notice whether motion continues once the state has changed.
- Leave one door propped. Stop one task messily, on purpose, and see what re-entry costs the next day.
- Remove one switch. Batch two things or protect one block. Notice what the day feels like with one fewer doorway in it.
Your smallest next step
Not the task. The doorway. One physical action, small enough to do in the next ten minutes.
What surfaced for you?
No right answers. Just notice what came up while you worked through this.
The wall was never the task. It was always the transition, in both directions. The doorway is the thing you get to make cheaper.
Danielle Ralston
MBA, MSW, ADHD-CCSP, PhD(c), Master ADHD Coach, AuDHD, Founder of ND Hive
Read the full guide: Autistic Inertia →
Work this with people who get it. Start your 7-day free trial of ND Hive →
© Ralston Collective Holdings LLC. ndhive.com
